CALL TODAY 01527 854519

Maintenance & Repair

Planscapes runs a full maintenance package for our customers. This can be a set regular routine pool maintenance of weekly, fortnightly, monthly for a set price or hourly chargeable rate for occasions when a breakdown in plant, equipment or pool water chemistry problems occur.

Offering summerising (opening up) and winterising (shutting down) of customers pools.

 
Lido refurbishment click here

 

Our regular maintenance scheme covers the following check listed items:

  • Check pool and/or spa for chemical levels

  • Vacuum pool

  • Clean pool skimmer baskets

  • Test any covers and report

  • Test underwater lights

  • Clean hair and lint pots

  • Backwash pool filters

  • Check autofeeder dosing levels and top up as necessary

  • Check ozone plant operation and air flow levels

 

We offer a full leak detection and pressure testing for Swimming pool leaks can be the most difficult of problems to solve, Planscapes has a team of fitters expert in leak detection along with the tools and equipment to find and report on such problems.

 

We have not only the tooling but skills for liner repairs; tile repairs and shell repairs; pipe repairs and renovations.

 

Case study

The Chipping Norton Lido approached Planscapes (Leisure) Ltd amongst outdoor swimming pool specialists to tender for the complete internal finishes refurbishment of the Lido’s 25 metre pool and children’s splash pool. 

Although various internal finishes were tendered Planscapes offered Hydrazzo as the best product for the job in hand and were afforded the contract to refurbish the internal finishes and double bull nosed copings to both the children’s splash pool and main 25m x 9m lido pool. 

As the previous finish was Marbelite having not only become badly etched but also having been patched and repaired over the years where areas were hollow, the ultimate choice was to strip out where necessary; re render out to an acceptable face finish; add new tile band and apply the new Hydrazzo and tiles over. 

Copings were to be lifted and re laid with a 10mm over sail from the new tile band and polished finish beneath. 

Works commenced late November 2014 with a completion date agreed by 20 March 2015. 


The time frame agreed was to allow for winter conditions when working with wet applied finishes; laying; setting and curing times. Due to the exposed nature of the site (windswept; typically higher and colder than the local surrounding Cotswold areas) a temporary truss structure was included within the contract to improve working conditions and protection for applied finishes from rain and colder conditions.  

Upon initial preparation works which included uplifting copings and cleaning off for re use; removal of tile band and disc cutting relief lines in the old Marbelite and render (to prevent hollows running through the old finish) it was very clear that the pool had at least 4 re surfaces with Marbelite over the last 30 years and indeed the pool shell concrete itself had rotted back to the steel reinforcement over approximately 6% of the structure. 

Following our discussions with the Lido’s management a scheme was put forward by Planscapes for a much more in depth renovation of not only finishes but structure.

With waiting times on finish choices (as special orders from America), works were finally completed on budget with the pools being filled on 23 March; 3 days beyond the agreed completion date. 

Overall the completed works have lifted the whole presentation; feel and benefit of the Lido’s pools for now and many years to come.

© 2016 by D.J Media